Potterton Prima F 30 100 Boiler Manual Heating Spares Ltd

Potterton Prima F 30 100 Boiler Manual Heating Spares Ltd-Free PDF

  • Date:06 Nov 2019
  • Views:151
  • Downloads:2
  • Pages:28
  • Size:1.92 MB

Share Pdf : Potterton Prima F 30 100 Boiler Manual Heating Spares Ltd

Download and Preview : Potterton Prima F 30 100 Boiler Manual Heating Spares Ltd


Report CopyRight/DMCA Form For : Potterton Prima F 30 100 Boiler Manual Heating Spares Ltd


Transcription:

CE SAFETY PERFORMANCE QUALITY, Prima F boilers have been assessed by a Government appointed Notified Body and shown to meet the. Essential Requirements of the European Gas Appliance Directive . The Directive lays down requirements for the safety and efficiency of the appliance together with its design . construction and use of materials It also requires the production process to be covered by an approved. and monitored system of quality assurance , The BSI kitemark remains on the product demonstrating continued conformity with the relevant BSI safety . performance and quality BS 5750 standards , POTTERTON PRIMA 30F G C No 41 607 01 POTTERTON PRIMA 60F G C No 41 607 04. POTTERTON PRIMA 40F G C No 41 607 02 POTTERTON PRIMA 80F G C No 41 607 32. POTTERTON PRIMA SOF G C No 41 607 03 POTTERTON PRIMA 100F G C No 41 607 33. CONTENTS IMPORTANT, General Page No 2 The appliance must be installed and serviced by a. Optional Extras Page No 2 competent person as stated in the Gas Safety. Accessories Page No 3 Installation and Use Regulations 1984 . Installation Data Page No 3, Boiler Dimensions Page No 3 Prima F boilers formerly known as Profile Prima .
Site Requirements Page No 3 are certified by BSI for safety it is therefore important. Technical Data Page No 6 that no external control devices e g flue dampers . Installation Instructions Page No 11 economisers etc be directly connected to these. Commissioning Page No 18 appliances unless covered by these installation. Health and Safety Information Back Page instructions or otherwise recommended in writing . Control Systems Pipework and Any direct connection of a control device not. Wiring Guide Supplied in approved by Potterton could invalidate the BSI. User s Instructions Literature Pack certificate and the normal warranty . GENERAL, Prima F boilers are fully automatically controlled wall PRIMA 100F MODEL ONLY. mounted fan powered balanced flue appliances 1 metre horizontal flue system which provides a. using a cast iron heat exchanger and are available in maximum flue length of 955mm 37in . six outputs ranging from 5 86 29 3 kW 20 000 Vertical Flue system which allows the flue to pass. 100 000 Btulh through a flat roof and terminate at a maximum height. The boilers which are designed to provide domestic of 980mm 38in measured from the top of boiler case . hot water and or central heating must be used on PRIMA 30F 40F 50F 60F 80F Models only. INDIRECT FULLy PUMPED systems only which may 2 metre horizontal flue system which provides a. be sealed or open vented maximum flue length of 1955mm 77in . The boilers can be supplied with either of the following Vertical flue system which allows the flue to pass. types of flue system through a flat roof and terminate at a maximum height. Standard horizontal flue system which is suitable of 1980mm 78in measured from the top of boiler case . for a wall thickness of 100mm 4in to 510 20in , OPTIONAL EXTRAS. The following are kits available as optional extras Terminal Guard to be used when the terminal is. fitted less than 2m above a balcony above ground or. lnternal Fitment Kit which is suitable for a maximum above a flat roof to which people have access . wall thickness of 510mm 20 in is to be used where. access to the outside wall is impracticable 45 and 90 Flue Bend Kits giving greater flueing. flexibility Prima 30F to 60F only , Pump Cover Kits located on top of the boiler and. designed to conceal the pump and or any motorised Vertex Flue Kit giving greater vertical flueing. valves installed above the boiler Note Pump cannot flexibility through a roof space Prima 30F to 60F. be fitted above the boiler if the vertical flue kit is only . used , Full fitting instructions are provided with each kit . Terminal wan Plate where necessary can be fitted, to the outside wall face to improve the appearance SEE PAGE 10 FOR PART Nos OF FLUE KITS AND.
after making good around the terminal OPTIONS , 2. Supplied By www heating spares co Tel 0161 620 6677. ACCESSORIES, The following Potterton Myson controls are Motorised Zone Valve MSV222 or MSV228. recommended for use with your boiler Motorised Diverter Valve MSV322. Electronic Programmer EP2001 EP300i or EP6000, Thermostatic Radiator Valve. Cylinder Thermostat PTT2 or PTI100, Room Thermostat PRT2 or PRT100 Data Sheets describing these products are available. Frost Thermostat PRT100 FR on request , INSTALLATION DATA.
The installation of the boiler must be in accordance BS5440 Part 2 BS5449 Part1. with the latest relevant requirements of the Gas BS5546 BS4814 BS6891 . Safety Installation and Use Regulations local BUILDING REGULATIONS . building regulations IEE Wiring Regulations and the MODEL WATER BYELAWS . Byelaws of the Local Water Undertaking BRITISH GAS PUBLICATION DM2 . Detailed recommendations are contained in the GAS SAFETY INSTALLATION AND USE . following British Standards and Codes of Practice REGULATIONS . BUILDING STANDARDS SCOTLAND ,BS6798 BS5440 Part1 REGULATIONS . BOILER DIMENSIONS, RETURN so, 60 , 600, srr srr, I 100. 30, 40 I, 40 , FIG 1, Boiler 30F 40F 50F 60F 80F 100F. Dimension A 350 350 350 3SO 425 425, mm B 110 110 110 110 150 150. C NOTE , 103 103 103 103 143 143 IF PIPEWORK IS TO BE RUN DOWN THE BACK OF 1HE BOltER THE.
D 87 87 87 107 107 107 NORMAL CLEARANCE OF 25mm BElWEEN THE REAR OF THE BOILER. Flow Retum 22mm 22mm 22mm 22mm 28mm ANDWALLCANBEINCREASEOT035mmlFDESIREDBYIN ERTINGTHE. 28mm BOILER MOUNTING PLATE DURING INSTAUATlON, Connections Copper Copper Copper Copper Copper Copper. Dimensions in brackets apply when the mounting plate is inverted . SITE REQUIREMENTS, These boilers are not suitable for external installation installation of the appliance in a room containing a bath. and should not be fitted directly above a cooking or shower . appliance The boiler may be installed in any room . although particular attention is drawn to the require Where a room sealed appliance is installed in a room. ments of the current l E E Wiring Regulations and in containing a bath or shower any electrical switch or. Scotland the electrical provisions of the Building appliance control utilising mains electricity should be so. Standards applicable in Scotland with respect to the situated that it cannot be touched by a person using the. bath or shower , 3, Supplied By www heating spares co Tel 0161 620 6677. FLOW PIPE RETURN PIPE, , FLUE, ELBOW, CONTROL FAN SUPPLY. THERMOSTAT LEADS, CONNECTOR,PUMP OVER RUN FAN, THERMOSTAT.
THERMOSTAT, CAPILLARY FLUE HOOD, RETAINING CLIP, HEAT. EXCHANGER, OVERHEAT, THERMOSTAT, POCKET, BOILER DRAIN. CAP, ELECTRODE , COMBUSTION, CHAMBER, PILOT, AIR DEFLECTOR. CHANNEL, MAIN, BURNER, GAS COCK PUMP, OVER RUN, THERMOSTAT. CONTROL, BOX, GAS CONTROL, VALVE, BURNER PRESSURE.
TEST POINT, , OVERHEAT, THERMOSTAT, CONTROL, CODE BADGE. THERMOSTAT, FIG 2 GENERAL ARRANGEMENT, 4, Supplied By www heating spares co Tel 0161 620 6677. Where the installation of the boiler will be in an unusual 50mm 2 in at the top measured from the top of the. location special procedures may be necessary and BS boiler case except where the optional extra pump. 6798 gives detailed guidance on this aspect cover is to be fitted when 178mm 7 in should be. allowed , Ensure that the gas supply pipe and meter are large. enough for this appliance and any others that may be 100mm 4 in at the bottom of the boiler . run off the same meter Reference should be made to. Additional clearances to these are required during. BS6891, installation for lifting the boiler and 127mm 5 in is. required at the top of the boiler for access to the pipe. Boiler Mounting Surface connections , The boiler must be mounted on a flat wall which may be Ventilation.
of combustible material and must be sufficiently robust. to take the weight of the boiler The requirements of the. If the boiler is to be installed in a confined space such as. a cupboard the space will need ventilating Openings. local authorities and the Building Regulations must be. must be provided at the top and bottom of the cupboard. adhered to , each of which should have a free area as shown in. TABLE 1 Further details for installation of a boiler within. IMPORTANT NOTICE a compartment are given in BS 6798 . TIMBER FRAMED HOUSES, If the appliance is to be fitted in a timber framed building TABLE 1. it should be fitted in accordance with British Gas PRIMA AIR VENT AREAS. Publication DM2 Guide for Gas Installations in Timber. Framed Housing If in doubt advice must be sought in2 cm2. from the local Gas Region of British Gas 30F 16 103. 40F 21 135, 50F 26 170,Clearances Around the Boiler 60F 32 206. The following minimum clearances must be maintained 80F 43 277. after installation for correct operation and servicing of 100F 54 349. the boiler , If the openings draw air from outside the building the. 61 Omm 2 ft at the front of the boiler, free areas may be halved Refer to BS 5440 Part 2.
Smm 0 2 in each side of the boiler for further guidance . Balanced Flue Terminal and Ducting INFORMATION RELATING TO VERTICAL FLUING IS. The fresh air inlet and flue ducts can be run from either PROVIDED IN THE PACK CONTAINING THE VERTI . the left right rear or top of the boiler to a miniature CAL FLUE SYSTEM . terminal on the outside of the building NOTE, Where a flue terminal is fitted less than 1000mm from a. The minimum spacings from the terminal to obstructions plastic or painted gutter or 500mm from painted eaves . and ventilation openings are shown in FIG 3 For infor an aluminium shield of 1000mm length should be fitted to. mation appertaining to horizontal flue lengths underside of gutter or eaves . reference should be made to FIG 4 , Any car port or other add on extension should consist of. a roof or a roof and one other wall If it consists of a roof. If a terminal is fitted less than 2m above a balcony above and two other walls the installation shall be treated as. ground or above a flat roof to which people have access suspect and further advice sought . then a suitable terminal guard should be fitted P l L. No 205792 , Ref er to BS5440 Part 1 for further guidance POSITION MINIMUM DISTANCE. A DIRECTLY BELOW AN OPENABlE, WINDOW AIR VENT OR ANY OlHER. VENTILATION OPENING 300, B BELOW GUTIER DRAIN SOIL PIPE 25.
C BELOW EAVES 25, 0 BELOW A BALCONY OR CAR PORT ROOF 25. E FROM VERTICAL DRAIN PIPES ANO, SOIL PIPES 75, Under Carport F FROM INiERNAL OR EXlERNAL CORNERS 25. , , G ABOVE ADJACENT GROUND OR BALCONY, LEVEL 300. H FROM A SURFACE FACING THE TERMINAL 600, fo, 1 o I FACING TERMINALS 1 200. L J FROM OPENING DOOR WINDOW IN, CARPORT INTO DWELLING 1 200.
G K VERTICALLY FROM A TERMINAL ON, THE SAME WALL 1 500. L HORIZONTALLY FROM A TERMINAL ON, FIG 3 THE SITING OF BALANCED THE SAME WALL 300. FLUE TERMINALS M ADJACENT TO OPENING 150, Supplied By www heating spares co. 5 Tel 0161 620 6677, REAR OR SIDE FLUEING, MAXIMUM. LENGTH X , STANDARD FLUE s1omm, SYSTEM 2Qin , 1 METRE RULE 955mm.
SYSTEM 37in , 100F MODEL ONLY, 2METRE FLUE 1955mm. SYSTEM, 30f 40F 50F 60F 80F, nin , MODELS ONLY,FIG 4 FLUE LENGTHS. ELECTRICITY SUPPLY should be controlled by an exclusive 3A fused double. pole switch having at least 3mm contact separation. A 240 voHs 50Hz single phase electricity supply in both poles so that complete isolatron from the. fused to 3 amperes must be provided in accordance supply can be achieved to enable servicing work to. with the latest edition of the 1 E E Wiring Regulations be carried out in safety . and any other local regulations that may apply The. current rating of the wiring to the boiler must exceed GAS SUPPLY. 3 amperes and have a cross sectional area of at least. 0 75mm2 in accordance with BS 6500 Table 16 A gas supply pressure of 20 mbar is required at the. inlet to the appliance Performance data is based on. The supply to the boiler and its associated equipment use of reference gas G20 . TECHNICAL DATA, Maximum working head 30 Sm 100ft . Minimum working head 150mm 6in , Gas supply pressure 20mbar. Maximum flow temperature 82 C, Electricity supply 240v 50Hz fused at 3A.
Internal Fuse TypeT1A, Power Consumption 80 Watts excluding pump . Gas supply connection Re 1h in BSP female , 30F 40F 50F 60F Models 80F 100F Models. Appliance lift weight min 26 0kg 57 31bs 33 Skg 73 871bs . Appliance weight installed 37 1 kg 81 81bs 46 4kg 102 31bs . Water content 2 0 litre 0 44 gal 2 4 litre 0 53 gal . Row Return connections 22m copper 28mm copper, 6, Supplied By www heating spares co Tel 0161 620 6677. I, BOILER INJECTOR GAS RATE INPUT OUTPUT BURNER PRESSURE. I SIZE SIZE m ft kW Btu h kW Btu h mbar iowg,i Min 0 71 25 23 7 65 26116 5 86 20000 3 9 1 6.
l 30 Max, 2 9mm 0 87 30 61 , 1 03 36 23 , 9 29 31686 . 10 99 37500 , 7 33 25000 , 8 79 30000 , 5 9, 8 4, 2 4. 3 4, Min 1 06 37 40 11 35 38710 8 79 30000 6 5 2 6. l 40, Max, 3 1mm 1 21 42 86 , 1 37 48 31 , 13 00 44360 . 14 65 50000 , 10 26 35000 , 11 72 40000 , 8 6, 11 .
The following Potterton Myson controls are recommended for use with your boiler Electronic Programmer EP2001 EP300i or EP6000 Cylinder Thermostat PTT2 or PTI100 Room Thermostat PRT2 or PRT100 Frost Thermostat PRT100 FR Motorised Zone Valve MSV222 or MSV228 Motorised Diverter Valve MSV322 Thermostatic Radiator Valve

Related Books