By Alexander Wijaya,CUEL Limited Date 23rd August 2007. CPT REPORT Page Page 2 of 12,1 OBJECTIVE, The purpose of this Coating Procedure Test CPT Report is to comply with the. requirement of Norsok M 501 clause 4 12 records and reports where all. measurements and inspection results that have been taken and agreed by all. parties shall be recorded precisely in an appropriate manner and thus presented. in a systematic and comprehensive report in order to maintain adequate. traceability and provide sufficient information,2 NORMATIVE REFERENCES. 2 1 Main References, The following references were used as the main basis for conducting the Coating. Procedure Test, NORSOK M 501 Surface Preparation and Protective Coatings.
ISO 20340 Paints and Varnishes Performance Requirements. for Protective Paint Systems for Offshore and Related. Structures, ISO 12944 5 Paints and Varnishes Corrosion Protection of Steel. by Protective Paint Systems Part 5 Protective Paint. ALL0701V CON Q SPI 0002 Project Specific Procedural Instruction. 2 2 CPT Standard Practices, Methods for surface preparation and coating application during execution of the. CPT were based on the following standards where all of them are listed in. ASTM E337 Standard test method for measuring humidity with a. psychrometer, ISO 8501 1 Preparation of steel substrates before application of. paints and related products Visual assessment of,surface cleanliness Part 1 Rust grades and. preparation grades of uncoated steel substrates and. of steel substrates after overall removal of previous. ISO 8501 3 Preparation of steel substrates before application of. paints and related products Visual assessment of,surface cleanliness Part 3 Preparation grades of.
welds edges and other areas with surface,imperfections. SSPC SP1 Solvent cleaning, SSPC SP2 SSPC SP3 Hand tools cleaning Power tools cleaning. ASTM D4285 Standard test method for indicating oil or water in. compressed Air,By Alexander Wijaya,CUEL Limited Date 23rd August 2007. CPT REPORT Page Page 3 of 12, ISO 11125 2 Preparation of steel substrates before application of. paints and related products Test methods for,metallic blast cleaning abrasives Part 2.
Determination of particle size distribution, ISO 11125 6 Preparation of steel substrates before application of. paints and related products Test methods for,metallic blast cleaning abrasives Part 6. Determination of foreign matter, ASTM D4940 Standard test method for conductimetric analysis of. water soluble ionic contamination of blasting, ISO 8504 2 Preparation of steel substrates before application of. paints and related products Surface preparation,methods Part 2 Abrasive blast cleaning.
ISO 8503 5 Preparation of steel substrates before application of. paints and related products Surface roughness, characteristics of blast cleaned steel substrates Part. 5 Replica tape method for the determination of the. surface profile, ISO 8502 3 Preparation of steel substrates before application of. paints and related products Tests for the,assessment of surface cleanliness Part 3. Assessment of dust on steel surfaces prepared for,painting pressure sensitive tape method. ISO 8502 4 Preparation of steel substrates before application of. paints and related products Tests for the,assessment of surface cleanliness Part 4 Guidance.
on the estimation of the probability of condensation. prior to paint application, ISO 8502 6 Preparation of steel substrates before application of. paints and related products Tests for the, assessment of surface cleanliness Part 6 Extraction. of water soluble contaminants for analysis Bresle, ISO 8502 9 Preparation of steel substrates before application of. paints and related products Test for the assessment. of surface cleanliness Part 9 Field method for the. conductimetric determination of water soluble salts. SSPC PA1 Shop field and maintenance painting of steel. ASTM D4414A Standard practice for measurement of wet film. thickness by notch gages, SSPC PA2 Measurement of dry coating with magnetic gages. ISO 19840 Paints and Varnishes Corrosion protection of steel. structures by protective paint systems Measurement. of and acceptance criteria for the thickness of dry. film on rough surfaces, NACE RP0188 Discontinuity holiday testing of new protective.
coatings on conductive substrates, ISO 4624 Paints and varnishes Pull off test for adhesion. By Alexander Wijaya,CUEL Limited Date 23rd August 2007. CPT REPORT Page Page 4 of 12,2 3 Personnel Assessment Standards. The following methods were used for evaluating the personnel skills and. competences, ASTM D4228 Standard practice for qualification of coating. applicators for application of coatings to steel surface. 3 TEST PANEL AND COATING MATERIALS,3 1 Test Panel, A test panel with size of 1m x 1m and containing of 2 pipe ends from two.
standing pipes 1 angle and 1 flat bar was used in the execution of CPT for. qualifying all the coating procedures This test panel has been approved by the. owner representative prior to its selection as well as was witnessed during. execution of CPT, Test Panel Before fabrication Test Panel After fabrication. 3 2 Coating Materials, Coating materials from a single source supplied by International Paints were used. for the CPT The coating system consisted of primer and top coat where both of. them are the same materials which is Interzone 954 Modified Epoxy except they. are differentiated by the color The primer is gray while the top coat is yellow. The primer is gray in color,Product code for Part A is. EAXN35 and EAA964 for,Part B Shelf life not exceed. expiration date Supplied,with valid batch certificate.
By Alexander Wijaya,CUEL Limited Date 23rd August 2007. CPT REPORT Page Page 5 of 12,The top coat is yellow in. color Product code for Part,A is EAG135 and EAA964. for Part B Shelf life not,exceed expiration date,Supplied with valid batch. certificate,4 APPLICATION REQUIREMENTS, This section of the report summarizes all the important application requirements.
and their acceptance rejection criteria,4 1 Equipment protection and clean up. The test panel shall be fully protected from mechanical damages ingress of. abrasives and dust from blast cleaning Sags droplets and paint over spray. inclusive dry spray shall be avoided Areas not to be painted shall be protected. with a step of 100 mm On completion of the work in any area all masking. materials spent abrasives equipment etc shall be removed. 4 2 Ambient conditions, No final blast cleaning or coating application shall be done if the relative humidity. is more than 80 and when the steel temperature is less than 3 C above the. dew point Coating shall not be applied at ambient temperature above 50 C. The coating manufacturer shall specify the maximum and minimum application. and curing temperature and other relevant limitations regarding application and. curing conditions for each product in any coating system. 4 3 Coating materials, All coating materials and solvents shall be protected from ignition sources and. shall remain within storage temperatures and storage conditions recommended. by the coating manufacturer, All coating materials and solvents shall be stored in the original container bearing. the manufacturer s label and instructions Each product shall have a batch. number showing year and month of manufacture and giving full traceability of. production Shelf life shall not exceed the expiration date. By Alexander Wijaya,CUEL Limited Date 23rd August 2007.
CPT REPORT Page Page 6 of 12,4 4 Steel material, Steel subject to surface preparation on site shall as a minimum requirement be in. accordance with rust grade B according to ISO 8501 1. 4 5 Pre blasting preparation, Sharp edges fillets corners and welds shall be rounded or smoothened by. grinding minimum radius 2 mm, Hard surface layers e g resulting from flame cutting shall be removed by. grinding prior to blast cleaning, The surfaces shall be free from any foreign matter such as weld flux residue. slivers oil grease salt etc prior to blast cleaning All surfaces should be washed. with clean fresh water prior to blast cleaning, Any oil and grease contamination shall be removed in accordance with.
SSPC SSPM Volume 2 grade SP1 prior to blasting operations. Any major surface defects particularly surface laminations or scabs detrimental. to the protective coating system shall be removed by suitable dressing Where. such defects have been revealed during blast cleaning and dressing has been. performed the dressed area shall be re blasted to the specified standard. All welds shall be inspected and if necessary repaired prior to final blast cleaning. of the area Surface pores cavities etc shall be removed by suitable dressing or. weld repair,4 6 Blast cleaning, Blasting abrasives shall be dry clean and free from contaminants which will be. detrimental to the performance of the coating, Size of abrasive particles for blast cleaning shall be capable to produce surface. profile height anchor pattern profile of 50 85 microns This surface profile. shall be measured in accordance with ISO 8503, The cleanliness of the blast cleaned surface shall meet the requirement of at least. ISO 8501 1 Sa 2, The surface to be coated shall be clean dry free from oil grease and have the. specified roughness and cleanliness until the first coat is applied Dust blast. abrasives etc shall be removed from the surface after blast cleaning such that. the particle quantity and particle size do not exceed rating 2 of ISO 8502 3. The maximum content of soluble impurities on the blasted surface as sampled. using ISO 8502 6 and distilled water shall not exceed a conductivity measured in. accordance with ISO 8502 9 corresponding to a NaCl content of 20 mg m2. By Alexander Wijaya,CUEL Limited Date 23rd August 2007.
CPT REPORT Page Page 7 of 12,4 7 Paint application. The first coat or primer shall be applied within 4 four hours after blasting to. avoid oxidation, Mixing mix ratio thinning working pot life drying and curing time coating. interval time and method of application should be in accordance with the. material s technical data, For each coat a stripe coat shall be applied by brush to all welds corners behind. angles edges of beams etc and areas not fully reachable by spray in order to. obtain the specified coverage and thickness, Each coat shall be applied uniformly over the entire surface Skips runs sags and. drips shall be avoided Each coat shall be free from pinholes blisters and. holidays Contamination of painted surfaces between coats shall be avoided Any. contamination shall be removed, Wet film thickness should be measured for each coating applied in order to make.
sure the nominal dry film thickness will be achieved and within the range of. acceptable criteria as specified by ISO 19840 or SSPC PA2. Dry film thickness instrument to be used shall be of electromagnetic gage. specified by SSPC PA2 method of measurement and acceptance rejection criteria. shall meet the minimum requirement of SSPC PA2 or ISO 19840. Total dry film thickness required is at least 450 microns consisted of a minimum. 225 microns for primer and a minimum of 225 microns for top coat. 4 8 Testing of application quality, After the coating cures holiday test in accordance with NACE RP0188 shall be. done to trace for any discontinuity, Pull off adhesion test shall be also performed in accordance with ISO 4624 and. must meet the minimum adhesion of 5 0 MPa,4 9 Test panel results. A copy of the test panel result shall be issued for review approval and signature. by all parties A report shall be presented includes the records. 4 10 Health safety and environment, MSDS shall be provided by paint manufacturer and used when evaluating coating. By Alexander Wijaya,CUEL Limited Date 23rd August 2007.
CPT REPORT Page Page 8 of 12, All works to be carried shall comply with the minimum requirements of SSPC PA3. Safety in Coating Operation or NACE 6D163 Painter s Safety. 5 COATING PROCEDURE TEST,5 1 Pre qualification of coating materials. Surface Pre Inspection Environmental Tests,Check Fabrication Details Check Ambient Temp 0C. Check Rust Condition Check Surface Temp 0C,Check Other Contaminants Check Dewpoint C. Check Relative Humidity,Surface Pre Cleaning,SSPC SP1 Degreasing Coating Application.
SSPC SP2 Hand tools Check Mixing,SSPC SP3 Power tools Check Induction Time. Check Stripe Coat,Abrasive Inspection Check Spray Tip Size. Check Type Mesh Size Check Atomizing Pressure,Check Dirt Oil and Other Check Proper WFT. Contaminants,Check Salts on Abrasive,Dry Film Thickness. Calibrate Instrument,Equipment Inspection Take DFT Readings.
Check Oil Water Trap Mark Rejected Spot,Check Hoses Condition. Check Clamps Couplings,Check Blast Pot Condition Visual Inspection. Check Nozzle Type Size Check for any Application,Check Air Stream Quality. Immediate Action,Surface Cleaning Method,Holiday Detection. Minimum ISO 8501 1 Sa 2,Calibrate Instrument,Check Pin Hole s.
Surface Profile Anchor Pattern Mark Located Pin Hole s. Check by Replica Tape,Pull off Adhesion Test,Environment Conditions. ASTM D4228 Standard practice for qualification of coating applicators for application of coatings to steel surface 3 TEST PANEL AND COATING MATERIALS 3 1 Test Panel A test panel with size of 1m x 1m and containing of 2 pipe ends from two standing pipes 1 angle and 1 flat bar was used in the execution of CPT for qualifying all the coating procedures This test panel has been approved by the